Frequently Asked Questions
-
Costs vary from project to project. The main influences on cost are:
Size of the kitchen
Amount of renovation required (moving walls or plumbing for example).
Quality of materials selected.
-
The timing can vary depending on the size and scope of the project.
skön needs at least 1-month lead time before we start work in your home.
We use this time to:
Meet with you on site to evaluate the scope of your project.
Discuss design options and show you material and colour samples.
Create detailed Design Plans & Quotes that can be submitted for permits.
Build your kitchen cabinets (in Greater Vancouver) to the specifications of the approved design.
Once construction in your home begins, renovation can take between 1-3 weeks (depending on the size and scope of your project).
-
Yes!
Our Design & Construction Team will meet in your home or onsite to:
Evaluate the size and scope of your project.
Hear how you envision your dream kitchen.
Show you various material samples.
Discuss a variety of design ideas.
We then create a set of design plans for your review.
Once approved, these plans can be used to submit for permits.
-
All skön Kitchen cabinets are built to order, right here in Greater Vancouver.
This local manufacturing ensures:
Quality control. We guarantee your cabinets are built to the correct specifications.
Reduced lead time. There are no long distance, cross-country, or out-of-country shipping delays to worry about.
-
Kitchen design layouts can be customized in a variety of ways, to match both your dreams and budget.
The main influences on design are:
Size of the kitchen
How much renovation you are willing to undertake (moving plumbing, electrical, walls, etc.)
Building limitations (apartments and condos may not let you change the footprint of the kitchen, for example)
-
When you book an in-home or on-site appointment, our Design Team will bring a variety of samples and colours for you to consider.